The design implementation adopted pre-cast tilt up concrete panels for the perimeter walls spanning a maximum of 13m high. This eliminated the need for expensive scaffold and site establishment cost. The challenge was then to accommodate a 300t mobile crane for the erection of the 40 to 50 t concrete walls whilst having an under level carpark causing a split level of the narrow and long construction site. Amaan carefully designed, planned and executed each part of the construction and delivered a high quality build with first class finishes.